Built faster than anyone expected to need them
Newport News, the class, and the rate of construction.
Thirty-two hulls were contracted and twenty-four were commissioned, the last of them in May 1946. This section is about how four yards managed that, and what the rate cost in design freedom.
Keel blocks set out in an empty dock; the blocks go down before the ship does.
3 pages in this section
- Twenty-four completed of thirty-two orderedThe Essex class was ordered in numbers that assumed a long war and delivered at a rate that is the actual story of the Pacific campaign.
- One yard built the name ship and much of the classNewport News Shipbuilding delivered Essex herself, and the yard's capacity is part of why the class arrived when it did.
- A subgroup with a different bow, and whyThe Ticonderoga long-hull ships lengthened the forward end to improve seakeeping and allow a different gun arrangement.